EN 1090-2: what testing for which execution class?
EXC1, EXC2, EXC3, EXC4. How yours is determined, what it actually changes on the job, and why the volume of testing climbs so fast.
The scenario never changes. A steel fabricator receives a drawing with "EXC3" noted in a corner and no further explanation. He calls: "what does that mean for me, in practice?"
In practice it means the amount of non-destructive testing to allow for has just been multiplied, that the requirements on welder and procedure qualification have tightened, and that traceability has become a deliverable in its own right. The execution class is not a label: it is the parameter that drives the rest of EN 1090-2.
The execution class is not chosen at inspection
First misunderstanding to clear: neither you nor we decide the execution class. It is assigned upstream, normally by the design office or the client, and it appears in the contract documents.
If it does not appear, that is not an invitation to pick one. It is a point to raise in writing, before welding. We regularly see structures fabricated "to EXC2 by default" because nobody asked, and discovering at handover that EXC3 was required costs infinitely more than the phone call that could have been made six months earlier.
One qualification that matters: the standard describes a method for assigning the class, but gives it in an informative annex. It is therefore not mandatory. An engineer may adopt a class on other grounds, provided the choice can be justified. Which means two things: the method is an aid, not an automatic verdict — and that justification has to exist somewhere.
How the class is determined
The method offered crosses three inputs.
The consequence class — CC1, CC2, CC3 — reflecting how serious it is if the structure fails: building type, height, floor area, occupancy. The great majority of ordinary structures fall under CC2.
The service category — SC1 or SC2 — separating what is statically or quasi-statically loaded from what is subject to fatigue within the meaning of EN 1993-1-9, or located in a region of moderate to high seismicity. An overhead crane runway, a rotating machine foundation, a footbridge: you have left SC1.
The production category — PC1 or PC2 — looking at how the component is made. Non-welded components, or welded in ordinary grades, sit in PC1. Higher grades, site welding, hot forming and thermal treatment push you into PC2.
Crossing those three gives the class. In practice an ordinary shop-fabricated building often lands in EXC2; as soon as fatigue, site welding or high yield strength steels appear, it moves up.
What the class really changes
Four things move at once, and the effect is cumulative.
The quality level of the welds. EN 1090-2 refers to the levels of EN ISO 5817 — D, C or B — and the required level tightens with the class. It is a fabrication requirement: it governs what the weld is allowed to contain, before any inspection is discussed.
The extent of non-destructive testing. This is the most visible line on a quotation. Visual inspection stays at 100 % of welds whatever the class — that is the baseline. What varies is the proportion of joints receiving supplementary testing: ultrasonics, radiography, magnetic particle or penetrant depending on the joint type.
Qualification of personnel and procedures. Welder qualification, welding procedure qualification and welding coordination: the requirements harden class by class.
Traceability. At a low class it stays light. At a high class you have to be able to say which welder made which joint, to which procedure, with which consumable batch, and retrieve the corresponding inspection report. That is documentation work best organised from the first joint.
Why the volume of testing climbs so fast
We do not publish the percentages here — they are in the standard, they depend on joint type, and they can change at revision. An isolated figure out of context is a source of error, not of information. The mechanism, though, is worth understanding, because it explains the price gaps that surprise so many clients.
Three parameters combine.
The execution class: the proportion tested rises at each step, and not linearly. Between the highest class and the one below it, the gap is considerable.
The joint type: a transverse butt weld in tension is not treated like a cruciform or T joint, nor like a longitudinal weld. The requirements differ because the risk differs.
The utilisation grade of the joint — how hard it works relative to its capacity. A lightly loaded joint does not need the same scrutiny as one close to its limit. This is the parameter non-specialists most often overlook, and it is sometimes what separates two apparently incomparable quotations.
Practical consequence: asking for a price "for EXC3" without stating the joint types and their utilisation grades is asking for a figure that means nothing. We will still give one if you insist, but it will be wide — in the wrong direction for you.
The detail everyone forgets: when to test
Testing carried out too early can be testing that has to be redone, and that is an expensive surprise at the end of a job.
Some cracks do not appear immediately after welding. Cold cracking, associated with hydrogen, can declare itself hours after cooling — sometimes much later, depending on grade, thickness and restraint. That is why a minimum delay between welding and testing is imposed in certain cases, and why that delay lengthens with thickness and with the sensitivity of the steel.
We would rather say it in advance: if your programme has you welding Thursday evening, testing Friday morning and shipping Saturday, there is a conversation to have. A favourable report obtained before the delay has elapsed does not carry the weight people assume, and an auditor will notice.
EN 1090-1 and EN 1090-2 are different things
A frequent confusion, and one that wastes meeting time.
EN 1090-1 covers conformity assessment and CE marking of structural components. It is what requires the fabricator to operate factory production control, and a notified body to certify it.
EN 1090-2 is the technical part: how the steel structure is executed, to what tolerances, with which qualifications and which inspections.
Our role sits with the second. We are the inspection body that performs the testing and reports the results; we do not issue CE marking certificates and we are not a notified body for EN 1090-1. If a client asks us for "the 1090 certificate", the first step is to establish which one — because nine times out of ten it is not something they will get from us.
Finally, the current edition is EN 1090-2:2018+A1:2024. Amendment A1 dates from May 2024. A specification still referring to the 2011 edition is not unusual; it is not blocking, but it deserves a note at the start.
Standards cited in this article
-
EN 1090-2:2018+A1:2024— Execution of steel structures and aluminium structures — Part 2: technical requirements for steel structures -
EN 1090-1— Part 1: requirements for conformity assessment of structural components -
EN ISO 5817:2023— Quality levels for imperfections in fusion-welded joints -
EN ISO 17635:2025— Non-destructive testing of welds — General rules for metallic materials -
EN 1993-1-9— Eurocode 3 — Design of steel structures — Part 1-9: fatigue -
EN 1990— Eurocodes — Basis of structural design
The editions given are those verified with the issuing body at the time of writing. Standards are copyright works: we reproduce neither their text nor their tables. They are available from NBN or from your national standards body.