Preparing an inspection request: what we need from you

Six pieces of information turn a three-day exchange into an answer within the hour. Here they are, with the reason each one matters.


"Hello, I need some testing on welds, can you give me a price?"

We get that several times a week, and we always answer it — with questions, which costs everyone two days. This page exists so those two days stop happening.

Nothing that follows is administrative. Each item changes either what we will do, or how long it takes, or who we send. And most of them you already have: they are in the specification your client sent you.

1. The applicable standard

This is the one genuinely indispensable item, because it drives everything else: the permitted methods, the acceptance criteria, the content of the report.

EN 1090 for structural steelwork, EN 13445 for pressure vessels, EN 13480 for industrial piping, a client code, a project specification. If you do not know which applies, the document that names it almost always exists: the specification, the order, or the drawing.

If genuinely nothing says so, tell us that too — it is information in itself, and it means the question needs to go back to your client before welding, not after.

2. The quality level and the acceptance criterion

Two distinct things, and we need both.

The quality level — B, C or D in the sense of EN ISO 5817 — describes what the weld is allowed to contain. It is fixed upstream by the product standard or the specification.

The acceptance criterion describes what the inspection may declare acceptable, and it depends on the method used. Not the same thing, and one does not follow mechanically from the other.

In practice: if your document says "level B" and nothing else, send it as it stands and we will work back up the chain. But if the acceptance criterion is written somewhere, that is one round trip saved.

3. The joint list — the centrepiece

This is the item that changes everything, and also the one we are sent least often. A joint list, even a rough one, beats the best description in prose.

For each joint, ideally:

  • a reference — a number, a line name, a position on a drawing;
  • the joint type — butt, T, fillet, branch;
  • the diameter, for pipework;
  • the thickness — it governs the choice of method and, in radiography, the exposure time;
  • the material — an austenitic is not inspected like a carbon steel, and on some materials a method becomes inapplicable;
  • the welding process, if you have it.

And here is the argument that usually settles it: you will have to produce that list anyway. It is what structures the inspection report we hand back to you, joint by joint. Building it at the request stage means building it once instead of twice — and it lets us price per joint rather than as a lump sum, which works in your favour as soon as the batch is of any size.

A rough spreadsheet is enough. We are not expecting a formatted document.

4. Accessibility

The inspection itself often takes less time than reaching the joint does. It is the item requests systematically forget, and the one that blows apart the gap between estimate and reality.

What we need to know: is the joint accessible at ground level, at height, from scaffold, from a platform? In a confined space? Is the surface bare, painted, insulated? Is one face accessible or both?

For radiography, one further and decisive question: can the area be cleared during the exposure, and when? On an operating site that often means working at night or at weekends. That is not a problem — we operate seven days a week, around the clock — but it needs to be known in advance, not discovered on arrival.

5. Urgency, and what it means for you

We commit to being on site within 24 hours of the call for urgent work. Just tell us which situation you are in, because the three are not handled the same way:

  • Production stopped and waiting on the result to restart. Absolute priority, and we organise around it.
  • A handover or a delivery blocked by a missing document. Urgent too, but the constraint is administrative: sometimes the report is more pressing than the attendance.
  • Plannable inspection, in fabrication or within a scheduled shutdown. There, the earlier you tell us the better we serve you — particularly during shutdown season, when everyone is looking for crews at once.

One straight word about lead times: we would rather say no than promise a date we will not meet. If we cannot, we say so immediately.

6. Who the report is for, and in which language

An apparently minor detail that nonetheless costs days at the end.

Is the report for you, for your client, for a notified body? Should it be in French, Dutch or English? Is a particular format needed, a numbering that follows your quality system, an order reference to appear on it?

If the report has to slot into a fabrication dossier that a third party will read, say so at the outset. Redoing a numbering across forty joints after the fact interests nobody.

The bare minimum, if you are in a hurry

Do not have it all to hand? Send this much and it is enough to start:

  1. what needs inspecting, in one line — "40 butt joints on stainless pipework, DN80, 5 mm wall";
  2. the standard or specification, even just its name;
  3. where it is, and when;
  4. whether anything is stopped waiting for it.

With those four lines we already know whether we are the right people, which method to consider and when we can come. The rest is filled in by phone.

And if you do not know which inspection to ask for, that is fine: it is the most frequent question of all. Working back from the product standard to the method is part of the job, and it usually takes one call.

Standards cited in this article

  • EN ISO 17635:2025 — Non-destructive testing of welds — General rules for metallic materials
  • EN ISO 5817:2023 — Quality levels for imperfections in fusion-welded joints
  • EN ISO/IEC 17020:2012 — Requirements for the operation of various types of bodies performing inspection — the standard of our BELAC accreditation 786-INSP

The editions given are those verified with the issuing body at the time of writing. Standards are copyright works: we reproduce neither their text nor their tables. They are available from NBN or from your national standards body.

This article is an explanation, not a specification. It does not replace the standard in any way, and it deliberately contains no limit values and no numerical acceptance criteria. Where they differ, the applicable edition of the standard and your project specification prevail. For a specific case, call us.